9
C
C
H
H
A
A
P
P
T
T
E
E
R
R
3
3
G
G
E
E
T
T
T
T
I
I
N
N
G
G
S
S
T
T
A
A
R
R
T
T
E
E
D
D
Now that the site for your filtered enclosure is properly prepared,
you are ready to unpack, inspect, install, and validate your system.
Read this chapter to learn how to:
• Unpack and move the enclosure.
• Set up the enclosure with the proper supporting structure
and work surface.
• Connect to an exhaust system if applicable.
• Installation of HEPA and accessory Odor Control carbon
filters.
• Connect the electrical supply.
• Set the face velocity with the speed control adjustment.
• Arrange validation for the enclosure.
• Seal the enclosure to the work surface.
Depending upon which model you are installing, you may need
common mechanical and electrical installation tools in addition to
5/16", 3/8", 7/16", and 1/2" wrenches, ratchets, sockets, a nut
driver set, a flat-blade screwdriver, a Phillips screwdriver, and a
carpenter level to complete the instructions in the chapter.
Each enclosure model weighs between 125 to 195
lbs. each (55 to 85 kg). The shipping container
allows for lifting with a mechanical lift truck or
floor jack. If you must lift the enclosure
manually, follow safe-lifting guidelines. Do not
lift by the front air foil.
!